OEL 0.00% 1.1¢ otto energy limited

OK- and the last significant little bit you missed out from the...

  1. 261 Posts.
    lightbulb Created with Sketch. 48
    OK- and the last significant little bit you missed out from the report

    "These technical deficiencies on the part of the drilling contractors caused undue project delays."

    Drilling technology and processes has come along way in 12 years, hopefully with Paul Moore calling the shots, we may see a favourable result.
 
watchlist Created with Sketch. Add OEL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.