CTP 1.82% 5.4¢ central petroleum limited

And SRF won't have to wait long for his EPT, ie. from...

  1. 11,084 Posts.
    And SRF won't have to wait long for his EPT, ie. from announcement 23/12/12;

    "John Heugh
    Our short term goal has always been to produce crude oil and cash flow as soon as possible and with Extended Production Testing; we are now making the transition to a production company. Cash flow generation should begin in the next 2 or 3 months under extended flow test conditions where we will be able to sell the quality oil that is produced."

    RAVI
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.4¢
Change
-0.001(1.82%)
Mkt cap ! $40.98M
Open High Low Value Volume
5.5¢ 5.5¢ 5.4¢ $83.24K 1.515M

Buyers (Bids)

No. Vol. Price($)
3 257691 5.3¢
 

Sellers (Offers)

Price($) Vol. No.
5.4¢ 77 1
View Market Depth
Last trade - 12.21pm 15/11/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.