HDR hardman resources limited

oil flows from the top 2 sections at waraga

  1. 16,392 Posts.
    lightbulb Created with Sketch. 428
    Excellent results .. good flow from both the top two sections. Top shut in for pressure test by weeks end. Another 4,200 bopd from the middle resrvoir section and 2,115 pre-shutin flow fropm the top section (so it could increase).

    Unequivocal good news and Simon says this reduces the reservoir size required for commerciality as fewrer wells may be required. Total of over 10,000 bopd from the three levels and possibly more.

    H
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.