Harmano, the Cajun Express is not set up to do well testing at the moment, but as with almost all rigs it can be done... It requires a few boat loads of equipment to be delivered and set up...
Surge tanks, pressure vessels, high pressure pipe work, various choke and kill manifolds, control stations, all come in containers then are laid out and connected to the rig infrastructure....the flare booms are delivered and hung on the rig, as well as the high pressure water mist cooling system and steam boilers too.......
Takes about 1 - 2 weeks to set it all up.... It is a modular package that can be moved from rig to rig.... Most rigs have the abilility to well test, but don't carry the equipment because it takes a large amount of space on the rig, and well testing is not a regular thing done by most rigs.
Cheers JPG
- Forums
- ASX - By Stock
- Oil in the Ground
Harmano, the Cajun Express is not set up to do well testing at...
-
-
- There are more pages in this discussion • 42 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FAR (ASX) to my watchlist
|
|||||
Last
47.5¢ |
Change
-0.005(1.04%) |
Mkt cap ! $43.89M |
Open | High | Low | Value | Volume |
48.0¢ | 48.0¢ | 47.5¢ | $37.01K | 77.28K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 43897 | 47.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
48.0¢ | 32778 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 43897 | 0.475 |
1 | 28150 | 0.470 |
1 | 23142 | 0.460 |
1 | 50000 | 0.435 |
1 | 50000 | 0.425 |
Price($) | Vol. | No. |
---|---|---|
0.490 | 3155 | 1 |
0.500 | 87671 | 4 |
0.505 | 48000 | 2 |
0.510 | 30000 | 1 |
0.515 | 20000 | 1 |
Last trade - 16.10pm 06/08/2024 (20 minute delay) ? |
Featured News
NEWS
Is oil undervalued?
FAR (ASX) Chart |