NZO
14/08/2007
MINE
REL: 1709 HRS New Zealand Oil and Gas Limited
MINE: NZO: NZOG'S Hector-1 drilling report 14 August 2007
New Zealand Oil & Gas Limited ("NZOG") reports that at 0600 hours today, the
Hector-1 well was being plugged and abandoned at a total measured depth of
3,825 metres.
After completion of operations at Hector-1, the Ocean Patriot rig will be
moved to drill the Taranui-1 well in PMP 38158. NZOG estimates the Taranui
Prospect to potentially have an estimated 15 million barrels of recoverable
oil. A discovery at Tarnui-1 would most likely be fast-tracked for
development through the existing Tui area FPSO and facilities.
ENDS
- Forums
- ASX - By Stock
- oil production started at the tui
NZO 14/08/2007 MINE REL: 1709 HRS New Zealand Oil and Gas...
Featured News
Add NZO (ASX) to my watchlist
|
|||||
Last
36.5¢ |
Change
-0.005(1.35%) |
Mkt cap ! $81.74M |
Open | High | Low | Value | Volume |
38.0¢ | 38.0¢ | 36.5¢ | $11.58K | 31.53K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5 | 37.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
42.0¢ | 3850 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5 | 0.375 |
1 | 1400 | 0.370 |
1 | 52649 | 0.365 |
1 | 8085 | 0.360 |
1 | 290 | 0.350 |
Price($) | Vol. | No. |
---|---|---|
0.420 | 3850 | 2 |
0.440 | 12500 | 1 |
0.000 | 0 | 0 |
0.000 | 0 | 0 |
0.000 | 0 | 0 |
Last trade - 13.27pm 21/06/2024 (20 minute delay) ? |
Featured News
NZO (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online