ELK 0.00% 1.4¢ elk petroleum limited

BOS,chemical flood would still be twelve months to be in full...

  1. 453 Posts.
    BOS,

    chemical flood would still be twelve months to be in full production and the pilot is not due to commence until April.
    By then OPEC will have turned off the tap...why waste a limited resouce at this price.
    All will be good.
 
watchlist Created with Sketch. Add ELK (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.