URANIUM 1.02% $24.70 uranium futures

Olympic Dam is primarily a copper project and is not going ahead...

  1. 58 Posts.
    lightbulb Created with Sketch. 1
    Olympic Dam is primarily a copper project and is not going ahead because of softening demand for copper in China. the uranium and gold are by-products so price of U in the future is not a big part of the decision to cut back.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.