Market cap $120.6m present, Cash in bank $225m from 1 Jan 2013, Plant apx. $120m minimum, Production apx. 185,000 oz. gold, Total debt apx. $20m, 2 Production centres. Large greenfields project on BLF (richest fault on planet) – massive drill campaign 2013, Large Nickel project extensive deep drill campaign 2013, Large highly prospective gold areas Coolgardie extensive drill campaign 2013, Large highly prospective gold areas Laverton extensive drill campaign 2013,Massive production upgrades planned, final plans probably announced 2013. Easy access to finance if needed. Rapid access to quality manufacturing mining equipment. Access if required to experienced thin vein specialists. World class geological team several geos. Found multi mine/multi M oz deposits.
FML – FOCUS MINERALS
- Forums
- ASX - General
- one (1) must have stock for 2012
one (1) must have stock for 2012, page-175
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online