Excellent news on the Bong. If they completely remove the cemented drill pipe it will produce like the others. Initially it sounded like they thought concrete was inside the pipe and they would have to mill that out and run a smaller production pipe inside the drill pipe.
Perhaps more under promise over deliver as I thought this well was a write off.
3 more wells to come online in a month or so will have our production close to 1000BOEPD
- Forums
- ASX - By Stock
- SSN
- op advsory
op advsory, page-6
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares