Excellent news on the Bong. If they completely remove the cemented drill pipe it will produce like the others. Initially it sounded like they thought concrete was inside the pipe and they would have to mill that out and run a smaller production pipe inside the drill pipe.
Perhaps more under promise over deliver as I thought this well was a write off.
3 more wells to come online in a month or so will have our production close to 1000BOEPD
SSN Price at posting:
2.6¢ Sentiment: LT Buy Disclosure: Held