MEU 4.55% 4.2¢ marmota limited

Open Letter to Dr Colin Rose, page-15

  1. 118 Posts.
    lightbulb Created with Sketch. 52
    It seems a lot of people have a short memory when i come to the recent diamond drill program.

    To qoute marmota

    Objectives of Diamond Drilling Program
    The diamond program [ see ASX:MEU 6 July 2021 ] is primarily a production-focused program, designed to
    provide the necessary detail to advance Aurora Tank to production, including:
    1. Geotechnical: design of optimal pit walls at Aurora Tank
    2. Bulk Density measurements:
    Required for completing (a) resource estimation and (b) scoping/feasibility studies
    3. Bulk samples to enable final phase metallurgical testing across:
    a) different weathering zones (from strongly weathered oxide zones to deeper fresh rock) and
    b) different areas of the deposit, including the first diamond drilling in the high-grade NW flank

    This wasnt an exploration focused rc drilling program, and a lot of work would need to be done with the core before cutting and crushing for assay.

 
watchlist Created with Sketch. Add MEU (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.