MEU 2.17% 4.5¢ marmota limited

It seems a lot of people have a short memory when i come to the...

  1. 118 Posts.
    lightbulb Created with Sketch. 52
    It seems a lot of people have a short memory when i come to the recent diamond drill program.

    To qoute marmota

    Objectives of Diamond Drilling Program
    The diamond program [ see ASX:MEU 6 July 2021 ] is primarily a production-focused program, designed to
    provide the necessary detail to advance Aurora Tank to production, including:
    1. Geotechnical: design of optimal pit walls at Aurora Tank
    2. Bulk Density measurements:
    Required for completing (a) resource estimation and (b) scoping/feasibility studies
    3. Bulk samples to enable final phase metallurgical testing across:
    a) different weathering zones (from strongly weathered oxide zones to deeper fresh rock) and
    b) different areas of the deposit, including the first diamond drilling in the high-grade NW flank

    This wasnt an exploration focused rc drilling program, and a lot of work would need to be done with the core before cutting and crushing for assay.

 
watchlist Created with Sketch. Add MEU (ASX) to my watchlist
(20min delay)
Last
4.5¢
Change
-0.001(2.17%)
Mkt cap ! $48.89M
Open High Low Value Volume
4.6¢ 4.6¢ 4.5¢ $4.098K 89.1K

Buyers (Bids)

No. Vol. Price($)
4 252019 4.5¢
 

Sellers (Offers)

Price($) Vol. No.
4.6¢ 190515 2
View Market Depth
Last trade - 15.35pm 03/07/2024 (20 minute delay) ?
MEU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.