The main testing happens on the way down of the drill,no engineers report ever from this coy as to why the hole is possibly unstable,and what the hell does the govt specialist know he said it should be flowing at 466 bopd,i would replace him as he doesn't know what he is talking about does he ?
Again its obvious that the govt rep is not capable of the job and identifying that countries oil sector.
They need to employ LAR and oil production will be cut by 70%..anyway they will start to smell the stink soon as there losing millions.
Yes I'm bitter but at least I'm real..i think..ouch ..yes I'm real and I'm still not a kiwi...
i'll shut up now as I'm a troll I think,i need people to buy so I can get out.
- Forums
- ASX - By Stock
- open up atzam 4 immediately!
The main testing happens on the way down of the drill,no...
-
- There are more pages in this discussion • 46 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ETR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ETR (ASX) Chart |
Day chart unavailable