This could be the best part.
"The High Cliff Sandstone (HCSS) interval from the other zones with a completion packer. This is expected to take approximately three weeks to complete. 2 3/8” tubing will then be run from surface to the installed packer, and the HCSS interval flowed back in isolation for a period of 2-3 weeks."