The frac was started ahead of schedule ! That's a positive change in reality exceeding expectations. That's almost a first for SSN. Keep it up !
At the briefing TB was implying that flow rates will be known as soon as the frac was finished ? On previous Wells we always had about a 2 week wait whilst a workover rig was brought in to drill out the frac plugs. Maybe they are using the big rig to do this or the technique has changed.
That Ann doesn't mention a workover rig. Could be flow rates by the end of the week or Monday ! Followed by 2 more wells coming online soon after.
- Forums
- ASX - By Stock
- SSN
- operational advisory 10 sept.
operational advisory 10 sept., page-5
-
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)