Read the March 4 advisory. It states the workover rig was on site and flow back would begin at the end of the week! That was 2 weeks ago! very frustrating.
- Forums
- ASX - By Stock
- operational advisory 20/3
Read the March 4 advisory. It states the workover rig was on...
-
-
- There are more pages in this discussion • 116 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)