Pumping total fluids of 450-500 bbls per day, with oil cut Increasing over the 5 day period to about 30% or 130 bopd. As frac fluid % declines oil cut and therefore bopd should increase
> 200 bopd still a strong possibility
Finally we start to see the picture clearing. Not earth shattering results so far, but a very good solid first step.
Cheers, Sharks.
- Forums
- ASX - By Stock
- SSN
- operational advisory 23/1
operational advisory 23/1, page-3
-
- There are more pages in this discussion • 101 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)