forgive me if a am wrong
but didnt we have problems pushing through the salt dome on this and as such only fraced the top section.
Was the plan moving forward to get a supa kick ass drill to punch thorugh the salt dome for the next one?
I am talking about the right well?
and if so, one would have to think that getting 200bopd just out of the top section is a pretty good effort.
And from this , if thye do push thropugh the salt dome then ?????
- Forums
- ASX - By Stock
- SSN
- operational advisory 23/1
operational advisory 23/1, page-35
-
-
- There are more pages in this discussion • 69 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)