Looks like the delays and waiting are just about over.
I was thrilled to see our frac date not only stay at the 7th but also when Ann said "Equipment is currently being mobilized for the fracture stimulation WHICH WILL BEGIN on Monday, November 7th. No more delays folks. It's frac time.
Snowy, I am putting a 2 week waiting period on fraccing and getting back an initial flow rate. I'm circling my calendar for the week OF 21st for results with hopes that we find out ON the 21st.
SOA back on track and drilling south again.
Only a minimal delay of a week on the Roosevelt but should be rigging up this week. I don't know how long before we frac these wells but drilling should take roughly 25-28 days to vertically drill, evaluate and run a horizontal.
GAME ON fellow SSNers!
Add to My Watchlist
What is My Watchlist?