Thanks for the post.
Decent comments overall but I'm not sure I agree with this bit:
"What this information tells me is that for this Hammamet West-3 well test the expected final stable flow rates of formation crude oil is likely to be around the 300-350 bopd range."
I really don't think that logic adds up and I think the final flow rate will be in excess of 400 bopd post acid, but I do agree that the 1700 peak flow rate is not indicative.
I've been looking on google for reports of acid stimulation flow rates and found in most cases an increase of between 2 and 5 times, which would put this somewhere between 800 and 2000 bopd.
But we'll just have to wait and see. I honestly think this well will need much longer to clean up properly due to the extreme drilling conditions encountered and the consequent mud program they used.
Dead right with the last paragraph though. As we have commented here many times before...
Add to My Watchlist
What is My Watchlist?