We have had a few talks about what the Current DMS is capable of and such.
We have also discussed the Tonka Trucks Haulage capacity.
And we have had some lovely discussions about Rivers, Overburden and Very big muddy puddles...
But I was wondering in everyones opinions, when LOM do receive the Mining License... what do you think would be the preferred Mining Rate that LOM would want to scale up to?
I mean they have talked about the DMS reaching around 100 and being modulated for expansion... so what would be a good level to expand it to? and what is the Expected Mine Life of the Alluvials?
- Forums
- ASX - By Stock
- Optimal Mining Tonne Rate
We have had a few talks about what the Current DMS is capable of...
-
-
- There are more pages in this discussion • 30 more messages in this thread...
This thread is closed.
You may not reply to this discussion at this time.
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LOM (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.0¢ |
Change
0.004(11.1%) |
Mkt cap ! $11.60M |
Open | High | Low | Value | Volume |
3.6¢ | 4.0¢ | 3.6¢ | $2.679K | 67.19K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 250000 | 3.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 56526 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 320546 | 0.035 |
1 | 85000 | 0.034 |
1 | 210000 | 0.033 |
1 | 10000 | 0.032 |
1 | 50000 | 0.031 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 56526 | 1 |
0.046 | 150000 | 1 |
0.053 | 100000 | 1 |
0.055 | 30000 | 1 |
0.062 | 120000 | 1 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
LOM (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online