Yes agreed, it seems that the last update on expected mining works was the $93k/day mentioned at the Africa Downunder conference... which as was discussed in detail, there was no explanation if this was turnover, profit, LOM's share, or total from the mining.
So yeah, all quite unsure about everything.
So hopefully once we receive the Mining License, we can then get some announcement about plans for the mining and such.
- Forums
- ASX - By Stock
- LOM
- Optimal Mining Tonne Rate
Optimal Mining Tonne Rate, page-4
-
-
- There are more pages in this discussion • 27 more messages in this thread...
This thread is closed.
You may not reply to this discussion at this time.
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LOM (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $11.31M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 145000 | 4.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.2¢ | 157819 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 145000 | 0.040 |
1 | 13000 | 0.038 |
1 | 60000 | 0.037 |
2 | 123111 | 0.036 |
3 | 381414 | 0.035 |
Price($) | Vol. | No. |
---|---|---|
0.042 | 157819 | 2 |
0.043 | 138576 | 3 |
0.044 | 112000 | 1 |
0.045 | 138400 | 3 |
0.046 | 181600 | 2 |
Last trade - 11.00am 17/10/2024 (20 minute delay) ? |
Featured News
LOM (ASX) Chart |
Day chart unavailable
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online