great day on EKA. must be almost at the hosston target by now....
After the 7 5/8 inch casing has been run and set, drilling will resume towards and into the
primary Hosston Formation target, which is expected to be reached within a few days. Based
on seismic data and an offset well the Hosston Formation is anticipated to consist of more than
4000 feet (1,220 metres) of inter-bedded sandstones and shales with the potential for multiple
prospective intervals.
great day on EKA. must be almost at the hosston target by...
Add to My Watchlist
What is My Watchlist?