G'day Gero-All good publicity -though
Hammer mill four was due to be commissioned this month and has a 25 tonne
per hour capacity to complement existing operations including the 25tph
hammer mill three, which was installed in January.
Don't believe this last Paragraph is correct as OGX has informed the market that
Hammer Mill Four has a 5o Tonne per Hour Capacity .
salt
- Forums
- ASX - By Stock
- OGX
- Orinoco’s gold run continues at Cascavel with Cuca assaying up to 300g/t
Orinoco’s gold run continues at Cascavel with Cuca assaying up to 300g/t, page-2
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OGX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online