JID,
Understand that ORS is now operating the underground mine on a 24/5 basis and is running at 2 mining shifts. That equates to development of +3 metres per day to advance the decline and develop the 1080 Level. By my rough estimate they need another 50 metres on the decline, 30 metres for ore access and other functions and can get about 50 metres of horizontal development completed to open up the Eaglehawk and Western Reef at the 1080 Level.
So there is a good chance that they might get very close to a break even quarter in terms of total cash outflow based on gold production. IF they manage to get the grade control issue under control, probably by scalping (mechanical screening out the large chunks of barren material) and by more carefully managing vein extraction.
IF they do manage to pull this off they have at least (from the 1,100 Level) 38 metres of high grade strike on the Eaglehawk to evaluate and 30 metres on the Western Reef.
Good Luck to all longs
- Forums
- ASX - By Stock
- ORS
JID, Understand that ORS is now operating the underground mine...
-
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ORS (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, MD & CEO
Anthony Noble
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online