AFTERNOON ALL,
Well the first stone has been laid at Goulamina,
The Goulamina lithium project is a high-end project. It has just been officially launched by Lamine Seydou Traoré, Minister of Mines, Energy and Water, in the Bougouni region.
This is the whole meaning of the Goulamina lithium project, in the Bougouni region, the first stone of which was laid yesterday by the Minister of Mines, Energy and Water, Lamine Seydou Traoré.The Goulamina lithium project is a world-class project whose construction will take 24 months and its operation is planned for 21 years, extendable. Over 109 million tonnes of mineral resources will be mined at 1.45% lithium oxide. Currently, drilling is underway to ensure the operation.
See link below,
https://www.maliweb.net/economie/industries/lithium-de-goulamina-pose-de-la-premiere-pierre-du-projet-2978866.html
Hold them tight people,
ALL IMO and DYOR
REGARDS
FINN
- Forums
- ASX - By Stock
- LLL
- Our Globally Significant Lithium Resource
Our Globally Significant Lithium Resource, page-2
- There are more pages in this discussion • 156 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $498.5M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LLL (ASX) Chart |
Day chart unavailable
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online