FROM THE ANNUAL REPORT -there is a fair bit happening!
Dynamic sleeve manufacturing concept
• June 2010 – preproduction tool complete
• September 2009 –mould trial
• October 2009 – initial prototypes
• November 2009 – April 2010
• June 2010 – serial pre-production tool (4 or 8 cavity) complete
Draw-up needle
• June 2010 – serial preproduction tool complete
• September 2009 –mould trial
• October 2009 - initial prototypes
• November 2009 – April 2010 – needle testing, expert focus groups
• April 2010 – field testing
• June 2010 – serial pre-production tool (4 or 8 cavity) complete
• June 2010 – tool manufacture to be validated for PQS standards
Advanced-flow draw-up &injection system
• August 2009 – April 2010 (product design, manufacture of prototype tools)
• May 2010 – December 2010 – product testing, focus groups, field test
• Mid 2011 (estimation only, depending on target market segment and related regulations)
Hypodermic needle
• September – November 2009 – phase 1 - needle tip trial with existing tool
• December 2009 – phase 2 – needle shaft moulding with dynamic sleeve tool
• December 2009 – January 2010 – phase 3 -needle testing
• February 2010 - August 2010
• Mid 2011 (estimation only, depending on target market segment and related regulations
- Forums
- ASX - By Stock
- TLZ
- outlook for the years ahead
outlook for the years ahead
Featured News
Add TLZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online