TLZ 0.00% 14.0¢ sim - telezon limited

outlook for the years ahead

  1. 804 Posts.
    lightbulb Created with Sketch. 4
    FROM THE ANNUAL REPORT -there is a fair bit happening!


    Dynamic sleeve manufacturing concept

    • June 2010 – preproduction tool complete
    • September 2009 –mould trial
    • October 2009 – initial prototypes
    • November 2009 – April 2010
    • June 2010 – serial pre-production tool (4 or 8 cavity) complete


    Draw-up needle

    • June 2010 – serial preproduction tool complete
    • September 2009 –mould trial
    • October 2009 - initial prototypes
    • November 2009 – April 2010 – needle testing, expert focus groups
    • April 2010 – field testing
    • June 2010 – serial pre-production tool (4 or 8 cavity) complete
    • June 2010 – tool manufacture to be validated for PQS standards


    Advanced-flow draw-up &injection system

    • August 2009 – April 2010 (product design, manufacture of prototype tools)
    • May 2010 – December 2010 – product testing, focus groups, field test
    • Mid 2011 (estimation only, depending on target market segment and related regulations)


    Hypodermic needle

    • September – November 2009 – phase 1 - needle tip trial with existing tool
    • December 2009 – phase 2 – needle shaft moulding with dynamic sleeve tool
    • December 2009 – January 2010 – phase 3 -needle testing
    • February 2010 - August 2010
    • Mid 2011 (estimation only, depending on target market segment and related regulations
 
watchlist Created with Sketch. Add TLZ (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.