From FMS last drill report dated 5/11/09.
Future Program
A heritage clearance is currently underway in the southern
arm of Delta, with the aim of attempting to complete the
Indicated drilling in all of Delta by the end of 2009. This
will involve bringing in an additional RC drill rig which will
double production to approximately 10 holes per day. The
2009 drilling programme is scheduled for completion in
early December, weather permitting.
The metallurgical drilling programme will continue in Eagle
and is on schedule to complete work by mid November
2009.
Drill core trays containing the PQ (83mm) diameter metallurgical core of BID mineralisation.
Surely we are close to release of the lastest Drill Report
When does the wet season start in the Pilbara
DYOR
- Forums
- ASX - By Stock
- RHK
- outlook
outlook, page-11
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RHK (ASX) to my watchlist
|
|||||
Last
84.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $168.8M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 12 | 85.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
88.0¢ | 10355 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 12 | 0.850 |
1 | 1500 | 0.820 |
1 | 5 | 0.805 |
1 | 3035 | 0.800 |
1 | 2531 | 0.770 |
Price($) | Vol. | No. |
---|---|---|
0.880 | 10355 | 1 |
0.890 | 2368 | 1 |
0.910 | 20000 | 1 |
0.980 | 10000 | 1 |
1.000 | 1812 | 2 |
Last trade - 16.11pm 16/07/2024 (20 minute delay) ? |
Featured News
RHK (ASX) Chart |
Day chart unavailable