RNE 20.0% 0.4¢ renu energy limited

As we posters have been pontification on the cause of the...

  1. 358 Posts.
    lightbulb Created with Sketch. 53
    As we posters have been pontification on the cause of the current problems at Habenero # 3 and the solution we have overlooked the most obvious problem facing those there -

    HOW DO YOU GET ACCESS TO THE DRILL PIPE TO DO ANYTHING?

    Remember that the well is configured for the Demonstration Generation plant. The pressure in the pipe is 350 atmospheres (enough to support a 3.5Km high water column) and the temperature is about 250 deg. They cannot just unbolt the pipe - they will first have to turn the flow off.

    The well head has a valve to do this. Where is it?

    In the well cellar. But this is where there is a high temperature, high pressure water steam flow that is the root of the problem. "Catch 22".

    There is a need to put a plug down the well to stop the flow - but how do they get access to the well to do this.

    Any suggestions.

    RB
 
watchlist Created with Sketch. Add RNE (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
-0.001(20.0%)
Mkt cap ! $2.904M
Open High Low Value Volume
0.5¢ 0.5¢ 0.4¢ $128 30.22K

Buyers (Bids)

No. Vol. Price($)
27 10050912 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 4218203 9
View Market Depth
Last trade - 15.42pm 31/07/2024 (20 minute delay) ?
RNE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.