The $3 million for a deposit on Mine Equipment is interesting. Would have thought that cost would have been in the $70 million. That says to me that we are going to start procurement before the $70 million is available.
So $3 million of the $70 million will be spare for other things.
Looks like we needed $4.5 million anyway for drilling and engineering on Stage 1 before we see any of the $70 million. We needed a CR regardless. AVB took the opportunity to grab some more while the interest was running hot.