Sure enough here it is. Hold on..
STAGE 3
Smelter Production (Aluminium metal) nil Nil 0.5Mt
Alumina Refinery (Alumina) 1.2Mt 2.4Mt 4Mt
Integrated Bauxite Mining Network 4.3Mt 8.6Mt 14.4Mt
Minimum JORC Compliant Reserves 300Mt 300Mt 300Mt
Total JORC Compliant Reserves and
Resources
600Mt 1,000Mt 1,500Mt
Key Project Milestones to commit to stage ? Short Term Alumina
transportation
? Long term cost
effective Alumina
? Low cost Power
p Generation
solution
? Tenements secured
? Reserves and
Resources
Confirmed
transport in place
? Reserves and
Resources
confirmed
Solution
(capacity, costs,
reliability)
? Reserves and
Resources
confirmed
- Forums
- ASX - By Stock
- overview of ord - huge potential
Sure enough here it is. Hold on..STAGE 3Smelter Production...
-
-
- There are more pages in this discussion • 146 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VAN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online