A1M 1.19% 41.5¢ aic mines limited

oxide project update, page-5

  1. 132 Posts.
    lightbulb Created with Sketch. 12
    Thanks BW & BG for your input.

    The forestry permit was mentioned during my conversation with Brad. I dont think getting the permit is an issue, time on the other hand is of an essence here. Might take a while.

    The heap leach scenerio results have provided the management a conclusion that this processing is an attractive economical option for them. Correcting my previous post, 2.4mil oz (0.55g/t gold) at $1000/oz and 80mil oz (18g/t silver) at $20/oz is still a massive amount. My understanding is with this option, you get much more in quantity but at lesser metal(Au&Ag) content, but economically, you get more $$$ based on a larger quantity.

    So far, the announcements have been very positive & timely. I am only skeptical about the SP, which looks like it is being adjusted/manipulated to reflect the SPP value. Perhaps it does not look good if the SPP discount is too high comes 17th Decemebr. (Meaning SP will waver around $1.90-1.92 during now to then, which SPP value is a 5% discount)

    FB
 
watchlist Created with Sketch. Add A1M (ASX) to my watchlist
(20min delay)
Last
41.5¢
Change
-0.005(1.19%)
Mkt cap ! $236.9M
Open High Low Value Volume
42.0¢ 42.5¢ 41.5¢ $263.6K 626.8K

Buyers (Bids)

No. Vol. Price($)
8 122421 41.5¢
 

Sellers (Offers)

Price($) Vol. No.
42.5¢ 16018 3
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
A1M (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.