A1M 1.61% 31.5¢ aic mines limited

oxide project update, page-5

  1. 132 Posts.
    lightbulb Created with Sketch. 12
    Thanks BW & BG for your input.

    The forestry permit was mentioned during my conversation with Brad. I dont think getting the permit is an issue, time on the other hand is of an essence here. Might take a while.

    The heap leach scenerio results have provided the management a conclusion that this processing is an attractive economical option for them. Correcting my previous post, 2.4mil oz (0.55g/t gold) at $1000/oz and 80mil oz (18g/t silver) at $20/oz is still a massive amount. My understanding is with this option, you get much more in quantity but at lesser metal(Au&Ag) content, but economically, you get more $$$ based on a larger quantity.

    So far, the announcements have been very positive & timely. I am only skeptical about the SP, which looks like it is being adjusted/manipulated to reflect the SPP value. Perhaps it does not look good if the SPP discount is too high comes 17th Decemebr. (Meaning SP will waver around $1.90-1.92 during now to then, which SPP value is a 5% discount)

    FB
 
watchlist Created with Sketch. Add A1M (ASX) to my watchlist
(20min delay)
Last
31.5¢
Change
0.005(1.61%)
Mkt cap ! $181.3M
Open High Low Value Volume
31.5¢ 32.3¢ 30.8¢ $203.2K 643.1K

Buyers (Bids)

No. Vol. Price($)
4 7793 31.5¢
 

Sellers (Offers)

Price($) Vol. No.
32.0¢ 46410 3
View Market Depth
Last trade - 16.10pm 12/09/2024 (20 minute delay) ?
A1M (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.