With the T H in place all day today Im thinking along with most aware share holders that there could be several situations at the well head.
1/ 3832m target ( Mungaroo ) reached and signs of GAS so T H announced while drilling continues to accertain the depth of the gas column.( likely )
2/ Nothing at target zone and drilling ahead to Intra Mungaroo at 4200m depth.(likely )
3/ Blanket T H while at target depth while in the zone of expectation.(unlikely )
4/ Drilled the Top and Intra Mungaroo and nothing so drilling ahead to the T Depth ( too soon yet ).
5/Gear break down so T H ( unlikely )
6/ Missed target altogether and evaluation of site before moving away ( unlikely-too soon )
7/Drilling ahead very slowly so as to throughly examine all cuttings, debri and drill mud ( slightly likely but not expected with a experienced operator running the show )8/Oil discovery, (unexpected)
9/With the delay between the "notice received " and the T H there could have been communication necessary with head office re the t H and head office would want to have all details communicated to its interested parties hence the total T H ( likely but slim chance )
Any original thoughts welcome, .
Wheres bm ?
Add to My Watchlist
What is My Watchlist?