Kindee ST 212, Padre Island Texas, Operator 37.5% WI
The Kindee ST 212 #1 well on the Plum Deep Structure was spudded on 1 August 2006 (Texas, USA).
The Board of Golden Gate Petroleum is pleased to advise that electric logging of the well has been
successfully completed.
Our preliminary interpretation of the logs has identified 4 zones which are potentially gas bearing and
warrant further investigation. Collectively these zones span a gross interval of over 1,000 feet.
As operator, Golden Gate is planning a comprehensive testing programme which it expects to
recommend to the Joint Venture. This will be the subject of a future announcement once the
programme has been approved by the Joint Venture. The programme will provide the additional
information needed to determine the commerciality of each of these zones.
Mr. Russotti remarked “The initial results from the electric logs are encouraging and the gross interval
encountered is in line with our pre-drill estimates. The final outcome is of course dependent on the
results of the testing programme.”
Partners in the Kindee ST 212 #1 well are:
Golden Gate Petroleum Ltd 37.5% WI
Lodore Oil and Gas LP 37.5% WI
Pantheon Resources Plc 25.0% WI
- Forums
- ASX - By Stock
- GGP
- padre island update
padre island update
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)