Does anyone know what happened to the MOU that Cougar Energy (UK) had signed with Pakistan back in August 2007? It was over developing a 400MW Power Station over in Pakistan. Cougar Energy (UK) is a 50% owned subsidiary of Cougar Energy. I'm guessing the deal just fell through. I'm not entirely sure how these MOU's work.
http://www.brr.com.au/event/26694/cxy-cougar-signs-mou-in-pakistan-for-major-power-project-development-dr-len-walker-md
- Forums
- ASX - By Stock
- CXY
- pakistan mou
pakistan mou
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)