Does anyone know what happened to the MOU that Cougar Energy (UK) had signed with Pakistan back in August 2007? It was over developing a 400MW Power Station over in Pakistan. Cougar Energy (UK) is a 50% owned subsidiary of Cougar Energy. I'm guessing the deal just fell through. I'm not entirely sure how these MOU's work.
http://www.brr.com.au/event/26694/cxy-cougar-signs-mou-in-pakistan-for-major-power-project-development-dr-len-walker-md
Does anyone know what happened to the MOU that Cougar Energy...
Add to My Watchlist
What is My Watchlist?