Highlights- The Paradox Basin #2 appraisal and development well is continuing to drill the Pennsylvanian Honaker Trail Formation at 9,390 feet (2,862m) and is drilling ahead at 10‐15 feet per hour. Drilling has been slowed slightly to maintain orientation to ensure optimal target intersection
- Golden State Resources expects to reach the intermediate casing point in the next 48 hours, depending on the condition of the current bit. After logging and setting the casing the well will enter the Paradox Basin sequence
- The Paradox Basin sequence contains multiple reservoir objectives the first of which is the Upper Ismay Formation. Depending on drilling rates it is expected this will occur approx. 4 days after setting 9⅝” casing
- The Ismay Formation will be penetrated below the elevation of the previous discovery well to test the lateral and vertical extent of the gas accumulation
Cheers, Pie :)
- Forums
- ASX - By Stock
- GDN
- paradox basin no 2 update ...
paradox basin no 2 update ..., page-2
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GDN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
1CG
ONE CLICK GROUP LIMITED
Mark Waller, MD
Mark Waller
MD
Previous Video
Next Video
SPONSORED BY The Market Online