G'day Pie
Key word from this ann'mnt is orientation.
I had brought this up in an earlier post# 3850742 on the 14th Mar.
One of the issues with fast drilling can b deviation from the vertical, so the deeper u go, the higher the angle build-up.
However this shouldn't b a concern at current depths, its the deeper faults that bother me.
cheers