GDN 0.00% 1.7¢ golden state resources limited

Hi PieAs per the cross section below, PB2 sits close to a deep...

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    Hi Pie

    As per the cross section below, PB2 sits close to a deep fault. Actually its on a raised block.

    With depth, the weight of the drill string increases (with each d/pipe, d/collar etc), & if they go flat out with drilling, chances of deviating are higher.

    Photobucket

    Generally 3-6 degrees is ok & can b controlled by slowing the drill rate. Thats what they meant this morn'n, so no surprises. At times drilling close to a major fault (just imagine a crack) could result in fluid losses etc, hence my concern. They'll b casing this section 2b on the safe side, later on IMO.

    cheers
 
watchlist Created with Sketch. Add GDN (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.