Since the insitu pressure was hardly enough, they flowed it thro' a smaller orifice (referred to as the choke size).
Another DST, flowed water for a separate section which was cased eventually, so technically we have 1.168 mmcfd on the table. This could b improved if they chose to frac it at a later date, which I doubt.
The management's focus should b on PB#2, its on a structural closure with better shows reported till date.
cheers
GDN Price at posting:
19.0¢ Sentiment: Hold Disclosure: Held