-
Share
11/05/09
10:57
Share
HIGHLIGHTS:-
- 7” casing has been successfully completed with the casing cemented to 12,956’ (3,949m) and pressure tested.
- The drill string is currently tripping back in hole to recommence drilling operations and conduct a formation integrity test.
- The first target is the Barker Creek Formation gas zone, which is one of the major gas bearing intervals in the Paradox Basin #1 well.
- Remaining targets are the Alkali Gulch and Pinkerton Trail formations, and Mississippian Leadville Limestone.
Cheers, Pie :)
-