Partial tunnel collapse at Snowy 2.0 construction site raises fresh safety concerns, page-4

  1. 18,261 Posts.
    Sorry @kingpins an in depth study was done and it showed that it was a lemon.

    It is that the perennial failure, Turnbull, believing his own spin that he is the smartest person in the room knew better.

    Much to the ongoing massive cost to the taxpayer.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.