Page 16 of the 4E, dated 27-08-2010, stated the Kan Tan rig was onsite.
"The Kan Tan IV drilling rig had arrived on‐site for the Pateke‐3H workover at the date of this report."
Success will mean some boost in production and probably have the sp trading above cash backing, 18-20cps ?
Failure could lead to a reserves downgrade.