The important thing is this line:
"FLOWBACK OPERATIONS IN PROCESS"
which means on the 23rd November they were busy recovering fracturing fluids. Also the inspection status is "PR" which equals producing.
Next step is production testing which we may have a hint of in time for the AGM tomorrow. Get a bit exciting now.
Recovered fracturing fluids are referred to as flowback
The important thing is this line:"FLOWBACK OPERATIONS IN...
Add to My Watchlist
What is My Watchlist?