1: Remove overburden of Strip Site 1. Say 1 acre; 22 yards, by 220. Remove spoil to Strip Site 2.
2: Remove Potash.
3: Refill Strip 1.
3: Remove overburden Strip Site 2. Remove spoil to strip site 3.
4: Remove Potash.
Into trucks, lads...dont worry about the rail line.
Sell potash.
Give half to the Eritreans, thank them for letting us in, and hopefully they will get schools etc andjobs and we get a return on the investment.
Quite the paradigm really.
So...thats what STB should do to pare away that 750mill capex...
No saunas Lorry.
Just Lorries.
Capex? Two big diggers. 20 B double trucks.
about 10 mil.
Cmon Rhodes....lets go 'sploring.
- Forums
- ASX - By Stock
- STB
- paul's here
paul's here, page-20
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)