Evening Coretreckers,
Tonight I located the details of a Federal Government project currently underway and to continue through to 2013.
This certainly made my night and here's why. I was reliably informed a little while back about this project however until this evening I have been unable to find any specific details relating to it. That is it was simply a conversation I had with someone. Now I can safely say 1 + 1 = 2 ;)
The drilling work that will need to be carried out at the site of this project in Kensington will almost certainly be performed by the GT3000.
This site is essentially surrounded by residential premises and as such with the project undoubtedly governed by noise restrictions this must surely be earmarked for CKK?
WC8
Below is an extract from Page 30 of the WAGES (Western Australian Geothermal Energy Symposium) during March this year.
"West Australian Geothermal Energy Symposium 2011
The ARRC / Pawsey Centre Geothermal Project: Opening the Door to an Urban Geothermal Future"
http://www.wageothermalsymposium.com.au/docs/2011_WAGES_Abstract_Volume_Digital.pdf
http://www.ivec.org/super-computing/pawsey-hpc-centre
- Forums
- ASX - By Stock
- CKK
- pawsey supercomputing centre csiro
pawsey supercomputing centre csiro
-
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CKK (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online