On 20 March 2007 GDN was at 15,397' trying to recover drill pipe, which it has cemented in. At this point the sp had fallen back considerably from its highs.
The major gas interval at 15,280' was in the pinkerton trail, which PB3 is not going to drill. Another major interval found was in the Alkali Gulch, which is also not going to be drilled in PB3. (PB2 failed to find gas in these intervals)
PB3 is only testing the Ismay and Desert Creek formations.
Cheers SBC
GDN Price at posting:
13.6¢ Sentiment: None Disclosure: Not Held