SBC you are making outrageous comments about pinkerton trail and Alkali Gulch depth which is also not going to be drilled in PB3.
If you check the map in the announcement you will note at what depth PB 1 and 2 intersected gas
PB1 intersected 3.6 mmcfd at 4734 metres. (15527 feet) PB2 intersected 1.6mmcfd at 4962 metres. (16275 feet)
3.28 feet is one metre. The map in the announcement shows that Ismay will be intersected at 4723 metres in PB3 (15491 feet).
I believe there is still a long way to drill. I must say the announcements are confusing with no details of target depth. Also the 55 day drilling period must end next week as drilling commenced in early Feb.
GDN Price at posting:
13.6¢ Sentiment: Buy Disclosure: Held