I've put together a graphic about the well-section & the progress on PB#2 so far, from spud till last friday's reported depth of 13030'.
Since setting the 7" casing at 12956', they've started drilling a 6" hole.
Pls dont worry about the technicalities at this stage (i.e. pipe weight, volume etc). Focus on the graphic for illustration sakes only. I've already posted earlier on abt the PDC bit.
Hopefully from here onwards, most holders should get a clearer picture of whats really going on.
cheers
GDN Price at posting:
19.0¢ Sentiment: Hold Disclosure: Held